Página 1 - © Baxi Heating UK Ltd 2011

© Baxi Heating UK Ltd 2011Baxi Megaflo System HE IE RangeGas Fired Wall Mounted Condensing BoilerInstallation & Servicing InstructionsThese instru

Página 2 - Natural Gas

10© Baxi Heating UK Ltd 20114.0 Technical Data4.2 Megaflo System 24 & 28 HE IE LPGFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase

Página 3 - Legislation

115.0 Dimensions and Fixings© Baxi Heating UK Ltd 2011360° Orientation Flue Ø 100mmDCBAEGFAt least1.5°HHeatingReturn(3/4”)HeatingFlow(3/4”)Pressure Re

Página 4 - Safe Manual Handling

126.0 System Details© Baxi Heating UK Ltd 20116.1 Central Heating Circuit1. The appliance is intended for fully pumped sealed systems.However it can b

Página 5 - CONTENTS

136.0 System Details© Baxi Heating UK Ltd 2011Fig. 3Filling Loop forSealed SystemsFig. 4StopValveDoubleCheckValveMainsColdWaterCHReturnTemporaryHosePr

Página 6 - 1.0 Introduction

147.0 Site Requirements© Baxi Heating UK Ltd 20117.1 Location1. The boiler may be fitted to any suitable wall with the fluepassing through an outside

Página 7 - 2.0 General Layout

157.0 Site Requirement© Baxi Heating UK Ltd 20117.3 Ventilation of Compartments1. Where the appliance is installed in a cupboard orcompartment, no air

Página 8 - 3.0 Appliance Operation

167.0 Site Requirements© Baxi Heating UK Ltd 20117.7 Condensate DrainFAILURE TO INSTALL THE CONDENSATE DISCHARGEPIPEWORK CORRECTLY WILL AFFECT THE REL

Página 9

177.0 Site Requirements© Baxi Heating UK Ltd 20117.8 FlueNOTE: Due to the nature of the boiler a plume of watervapour will be discharged from the flue

Página 10 - 4.0 Technical Data

188.0 Flue Options© Baxi Heating UK Ltd 2011HorizontalFlues(ii)(i)Plume Displacement 60 /100 dia Kit1M Extensions 45° & 93° elbowsare also availab

Página 11 - Dimensions

198.0 Flue Options© Baxi Heating UK Ltd 2011VerticalFluesVerticalFlues(Twin Pipe)(ii)(i)(ii)(i)8.2 Twin & Vertical Flue Systems1. Maximum permissi

Página 12 - 6.0 System Details

2© Baxi Heating UK Ltd 2011Natural GasBaxi Megaflo System 15 HE IEBaxi Megaflo System 18 HE IEBaxi Megaflo System 24 HE IEBaxi Megaflo System 28 HE IE

Página 13

208.0 Flue Options© Baxi Heating UK Ltd 2011Key Accessory Size Code NoFLUE GROUP AConcentric Flue System 100mm diameterA3 Telescopic Internal Flue Kit

Página 14 - 7.0 Site Requirements

218.0 Flue Options© Baxi Heating UK Ltd 20118.4 Twin Flue Duct Adaptor1. The kit allows connection of a twin flue system to theboiler adaptor.8.5 Twin

Página 15 - 7.0 Site Requirement

228.0 Flue Options© Baxi Heating UK Ltd 20118.6 For Roof Terminals1. In the case of a pitched roof 25 - 50 degrees, position the leadtile to replace/f

Página 16

239.0 Plume Displacement© Baxi Heating UK Ltd 20119.1 Plume Displacement Kit (Fig. 14)Kit No 5118638Content of kit1 0.9m 60/100 Concentric Flue1 1m 60

Página 17

249.0 Plume Displacement© Baxi Heating UK Ltd 2011Concentric 60/100 Flue60Ø ExhaustXYFig. 1720246810121460 Ø Exhaust (metres) XConcentric 60/100 Flue

Página 18 - 8.0 Flue Options

259.0 Plume Displacement© Baxi Heating UK Ltd 2011Min. 2 metresFig. 1950mmFlue TrimPosition of ‘Jubilee’ ClipscrewFig. 2430mm30mmFig. 21Fig. 23Fig. 20

Página 19

269.0 Plume Displacement© Baxi Heating UK Ltd 20119.3 General Fitting Notes (cont.)15. For aesthetic purposes it is permissible to route the60Ø exhaus

Página 20

2710.0 Installation© Baxi Heating UK Ltd 200710.1 Unpacking & Initial PreparationThe gas supply, gas type and pressure must be checked forsuitabil

Página 21

2810.0 Installation© Baxi Heating UK Ltd 200710.3 Fitting The Boiler1. Lift the boiler by holding as shown by the shaded areas.The boiler should be li

Página 22 - 315mm 500mm

2910.0 Installation© Baxi Heating UK Ltd 201110.6 Fitting The FlueHORIZONTAL TELESCOPIC FLUE1. There are two telescopic sections, the TerminalAssembly

Página 23 - 9.0 Plume Displacement

3© Baxi Heating UK Ltd 2011LegislationCodes of Practice - refer to the most recent versionIMPORTANT - Installation, Commissioning, Service & Repai

Página 24

3010.0 Installation© Baxi Heating UK Ltd 2011 10.6 Fitting the Flue (Cont)8. Adjust the two telescopic sections to dimension ‘Y’ (Fig. 42). Ensure t

Página 25

3110.0 Installation© Baxi Heating UK Ltd 201110.7 Making The Electrical ConnectionsThe boiler is fitted with a 1.3m length of 3 core of cable.This can

Página 26 - 200mm Min

3211.0 Commissioning© Baxi Heating UK Ltd 2011PumpAutomatic AirVentPressure GaugeScrew21043barFig. 52Selector SwitchCentral Heating Temperature Contro

Página 27 - 10.0 Installation

3311.0 Commissioning© Baxi Heating UK Ltd 2011Selector SwitchDisplay21043barCentral Heating Temperature ControlCalibration ControlFig. 56Fig. 57Fig. 5

Página 28

3412.0 Completion© Baxi Heating UK Ltd 201112.1 Completion 1. Instruct the user in the operation of the boiler andsystem including the integral timer,

Página 29

3513.0 Servicing© Baxi Heating UK Ltd 2011Case Front PanelFig. 62Facia Panel SecuringScrewsFig. 63Inner DoorPanelFig. 64CondensateTrapSump13 .1 Annual

Página 30 - Dimension ‘Y’

7.5±14±0.510±1Spark Ignition ElectrodeSensing Electrode3613.0 Servicing© Baxi Heating UK Ltd 2011Fig. 66Fig. 65Gas Inlet PipeVenturiInjectorFan, Colle

Página 31 - Z supply

3714.0 Changing Components© Baxi Heating UK Ltd 2011IMPORTANT: When changing components ensure thatboth the gas and electrical supplies to the boiler

Página 32 - 11.0 Commissioning

3814.0 Changing Components© Baxi Heating UK Ltd 201114.3 Fan (Fig. 69)1. Undo the nut on the gas inlet pipe to the venturi (Fig. 70)and pull the sensi

Página 33

3914.0 Changing Components© Baxi Heating UK Ltd 201114.6 Burner (Fig. 72) 1. Undo the screws securing the collector to the venturi andextension piece.

Página 34 - 12.0 Completion

4© Baxi Heating UK Ltd 2011Safe Manual HandlingGeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Página 35 - 13.0 Servicing

4014.0 Changing Components© Baxi Heating UK Ltd 201114.8 Flue/Heat Exchanger Thermostat Sensor (Fig. 74)1. Ease the retaining tab on the sensor away a

Página 36 - Sensing

4114.0 Changing Components© Baxi Heating UK Ltd 201114.13 Pump - Head Only (Fig. 78)1. Drain the primary circuit and remove the socket headscrews secu

Página 37 - 14.0 Changing Components

4214.0 Changing Components© Baxi Heating UK Ltd 201114.16 Pressure Gauge (Figs. 81 & 82) 1. Drain the primary circuit and undo the nut on the

Página 38

4314.0 Changing Components© Baxi Heating UK Ltd 201114.18 P.C.B. (Fig. 85)1. Note the settings of the temperature control knobs,rotate them fully anti

Página 39

4414.0 Changing Components© Baxi Heating UK Ltd 2011Gas ValveGas FeedElbowFig. 86Earth LeadExpansion VesselBoiler ChassisLock NutFig. 87Retaining Brac

Página 40

4515.0 Setting the Gas Valve© Baxi Heating UK Ltd 2011Selector SwitchDisplay21043barCentral Heating Temperature ControlCalibration ControlFig. 89Fig.

Página 41

4616.0 Electrical© Baxi Heating UK Ltd 2011- brown- black- blue- whitebrbkbw- green- green / yellow- redgg/yr Control PCBX2 X3X5011212 3344556789X112C

Página 42

4717.0 Short Parts List© Baxi Heating UK Ltd 2011Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.302 Flue Thermostat 5114747306 Burn

Página 43

4818.0 Fault Finding© Baxi Heating UK Ltd 2011NOTE: When instructed to turn theselector to the reset position turn theselector switch fully anticlockw

Página 44

4918.0 Fault Finding© Baxi Heating UK Ltd 2011Refer to Section 16.0 “Illustrated Wiring Diagram” for position of terminals and componentsCentral Heati

Página 45 - 15.0 Setting the Gas Valve

5© Baxi Heating UK Ltd 2011CONTENTS1.0 Introduction 62.0 General Layout 73.0 Appliance Operation 84.0 Technical Data 95.0 Dimensions and Fixings 116.0

Página 46 - 16.0 Electrical

5018.0 Fault Finding© Baxi Heating UK Ltd 2011Fault Finding Solutions SectionsIs there 230V at:Is there 230V at:Main terminals L and N Check electrica

Página 47 - 17.0 Short Parts List

5118.0 Fault Finding© Baxi Heating UK Ltd 2011Temperature sensors faulty.Cold resistance approximately10kΩ @ 25° C (DHW and CH sensors)20kΩ @ 25° C

Página 48 - 18.0 Fault Finding

52© Baxi Heating UK Ltd 201118.0 Fault FindingCheck and correct if necessary1. The mechanical set of the gas valve(CO2 values - see instruction)2. Fla

Página 49

5319.0 Notes© Baxi Heating UK Ltd 2011Supplied by HeatingSpares247.com

Página 50

1 11.0 Introduction© Baxi Heating UK Ltd 2011CONTROLSTIME & TEMPERATURE CONTROL TO HEATING ROOM T/STAT & PROGRAMMER/TIMER PROGRAMMABLE ROOMSTA

Página 51

55SERVICE 1DATEENGINEER NAMECOMPANY NAMETEL No.ENGINEER ID CARD SERIAL No.COMMENTSSIGNATURESERVICE 2DATEENGINEER NAMECOMPANY NAMETEL No.ENGINEER ID CA

Página 52

© Baxi Heating UK Ltd 2011UK Comp No5129838 - Iss 7 - 3/11BAXIA Trading Division of Baxi Heating UK Ltd (3879156),Brooks House, Coventry Road, Warwick

Página 53 - 19.0 Notes

6© Baxi Heating UK Ltd 20111.0 Introduction1.1 Description1. The Baxi Megaflo System HE IE is a fully automatic gas firedwall mounted condensing syste

Página 54

7© Baxi Heating UK Ltd 20112.0 General Layout2.1 Layout1. Expansion Vessel2. Automatic Air Vent3. Circulation Pump4. Drain Off Point5. Pressure Relief

Página 55 - SERVICE INTERVAL RECORD

8© Baxi Heating UK Ltd 20113.0 Appliance Operation3.1 Operating Mode (Fig. 2)1. With a demand for heating or hot water, the pumpcirculates water throu

Página 56 - Branches Nationwide

9© Baxi Heating UK Ltd 20114.0 Technical Data4.1 Megaflo System 15, 18, 24, 28 & 32 HE IEFlue Terminal Diameter 100mmDimensions Projection 125mmOu