Baxi MainEco Combi 35 Manual de Serviço

Consulte online ou descarregue Manual de Serviço para Aquecedores e fervedores de água Baxi MainEco Combi 35. Baxi MainEco Combi 35 Service manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
These instructions include the Benchmark Commissioning Checklist and should be left with the
user for safe keeping. They must be read in conjunction with the Flue Installation Guide.
United Kingdom
en
24-28-35 / 18-24
Installation and Service Manual
Wall Mounted Gas Condensing Boiler
Baxi MainEco Combi and System
Vista de página 0
1 2 3 4 5 6 ... 79 80

Resumo do Conteúdo

Página 1 - Baxi MainEco Combi and System

These instructions include the Benchmark Commissioning Checklist and should be left with the user for safe keeping. They must be read in conjunction w

Página 2 - Dear customer

2 Introduction2.1 Symbols usedIn these instructions, various danger levels are employed to draw theuser’s attention to particular information. In so d

Página 3 - Contents

In the interest of customers, we are continuously endeavouring tomake improvements in product quality. All the specifications stated inthis document a

Página 4

2.4 Homologations2.4.1. CertificationsCE identification noPIN 0063CM3019NOx classification5 (Standards EN)Type of connection (Flue gas outlet) C13, C3

Página 5

3 Safety instructions andrecommendations3.1 Safety instructionsDANGERIf you smell gas:1. Do not use a naked flame, do not smoke, do notoperate electri

Página 6

Casing componentsOnly remove the casing for maintenance and repair operations. Putthe casing back in place after maintenance and repair operations.Ins

Página 7 - EC declaration of conformity

4 Technical description4.1 General descriptionWall-hung gas condensing boilers4 High efficiency heating.4 Low pollutant emissions.4 Installation and c

Página 8 - 1.2 The Benchmark Scheme

4.3 Skeleton DiagramsCombi 24 - 28 - 351Primary heat exchanger2Hydroblock3Plate heat exchanger (DHW)4Safety valve5Heating flow6Domestic hot water outl

Página 9

4.4.2. CombustionThe burner heats the heating water circulating in the heatexchanger. At a return temperature lower than around 55°C, the fluegases co

Página 10 - 2 Introduction

4.4.6. Regulation of the water temperatureThe boiler is fitted with an electronic temperature regulator having anoutlet and return temperature probe.

Página 11 - User’s liability

System 18HManometric height central heating circuitQWater flow ( ΔT=20K)System 24HManometric height central heating circuitQWater flow ( ΔT=20K)4.6 Te

Página 12 - 2.4 Homologations

Dear customer,Thank you for purchasing this appliance.Please read this manual carefully before using the product and keep it in a safe place for futur

Página 13 - 3 Safety instructions and

Boiler type MainEco Combi 24 Combi 28 Combi 35 System 18 System 24Flue gas temperature min - max °C 32 - 78 32 - 84 31 - 82 32 - 65 32 - 78Maximum cou

Página 14 - 02092014 - 7619497-02

5 Installation5.1 Regulations governing installationWARNINGThe engineer must be Gas Safe registered and have thecorrect ACS qualifications.Codes of Pr

Página 15 - 4 Technical description

5.2 Choice of the location5.2.1. Type plateThe identification plate on top of the boiler features the boiler serialnumber and important boiler specifi

Página 16 - 4.4 Operating principle

When choosing the position for mounting the boiler, bearin mind the authorised position of the combustion gasdischarge outlets and the air intake open

Página 17 - 4.4.5. Adjustment

5.3 Main dimensionsBoiler Connection kitiConnection of the combustion gas exhaust pipe; Ø 60 mm hConnection of the air intake pipe; Ø 100 mm êSafety v

Página 18 - H (mbar)

5.4 Positioning the boilerThe following components are supplied as standard with the boiler:4 Mounting rail and mounting accessories for wall mounting

Página 19 - 4.6 Technical specifications

5.5.1. Flushing the systemInstalling the boiler in new installations (installations less than6 months old)4 Clean the installation with a universal cl

Página 20 - (1) Front panel removed

CAUTION4 The heating pipe must be mounted in accordancewith prevailing provisions.4 Carry out any soldering work required at a safedistance from the b

Página 21 - 5 Installation

5.5.6. Connecting the safety valve discharge pipe1.Connect the safety valve pipe to the safety valve outlet ê.CAUTION4 Any soldering must be completed

Página 22 - 5.2 Choice of the location

Termination to an internal soil and vent pipe(1)Set the discharge pipe at a gradient of at least 50 mm permetre, maximum horizontal length 5 metres.(2

Página 23 - Safety rating

Contents1.1 Building Regulations and the BenchmarkCommissioning Checklist ...61.2 The Benchmark Scheme ...

Página 24 - R000699-B

Pumped into an internal discharge branch (e.g. sink waste)downstream of the trapABasement or similar (heated).(1)Set the discharge pipe at a gradient

Página 25 - ≥ 250 mm

5.6 Gas connection1. Connect the gas inlet pipe GAS / GAZ.The pipe must have a diameter of at least 22 mm.WARNING4 Close the main gas valve before sta

Página 26 - R000737-A

5.7.2. OutletsWhen codes of practice dictate the use of a terminal guarduse a suitable guard of stainless steel construction. Theremust be a clearance

Página 27 - R000738-A

5.7.3. Lengths of the air/flue gas pipesTo define the maximum final length, you must deduct thepipe length in accordance with the reduction table.nRoo

Página 28 - 5.5.7. Connecting

5.7.4. Additional Directives4 Please refer to the manufacturer’s instructions for the material inquestion when installing the flue gas discharge and a

Página 29 - R000700-A

The boiler is fitted with a 3-wire power supply cable (cable length 1,5m) suitable for a 230VAC/50Hz power supply with phase/neutral/earth system. The

Página 30 - 5.5.8. Automatic air bleed

5.8.3. Access to the connector block / Boiler HMIThe connection box with instrument panel is supplied separately asstandard with this unit. The connec

Página 31 - R000735-A

Please read in conjunction with separate sheet"Connecting External Controls".nConnecting modulating controller The boiler is fitted with a O

Página 32 - 5.7.2. Outlets

nConnect frost protectionFrost protection in combination with on/off thermostatIf an on/off thermostat is used, it is advisable to protect any roomswh

Página 33 - L =

nConnect on/off contact (Enable)A 10-230 V signal can be connected to the CH and DHW connectorsto switch the production of heating water or sanitary w

Página 34 - 60/100mm

4.5 Circulating pump (Available pump head) ...164.6Technical specifications ...175 Installation ...

Página 35 - 5.8.2. Recommendations

5.9 Electrical diagramR000291-AP 230V, 50HzL NMAINS1 32BRBLGN/YWPCRS23212121223 1PSUTATRFSHL6 7 8 9 10 11 12 131 2 3 5SENSORSEITITHMIMAINSSENSORSPUMP

Página 36 - 5.8.4. Connection options

Total installed heat output (kW)≤ 7070 - 200 200 - 550 > 550Degree of acidity (waternon-treated)pH 7 - 9 7 - 9 7 - 9 7 - 9Degree of acidity (wat

Página 37 - R000038-A

5.10.3. Filling the systemCAUTION4 Before filling, open the valves on every radiator in theinstallation.4 Ensure that the boiler is switched off.1. Fi

Página 38 - Connect frost protection

5.10.4. Venting the systemIt is essential that you bleed any air in the calorifier, the conduits orthe taps to prevent the annoying noises likely to b

Página 39 - Connecting control panel

6 Commissioning6.1 Control panelMainEco Combi 24 - 28 - 351Domestic hot water temperature rotary knob2Heating water temperature rotary knob3Sweep key

Página 40 - 5.10 Filling the system

6.2 Check points before commissioning6.2.1. Preparing the boiler for commissioningWARNINGDo not put the boiler into operation if the supplied gas isno

Página 41

CAUTIONOn first firing the boiler, an odour may be present for ashort period.1. Open the main gas supply.2. Open the gas valve on the boiler.3.Turn th

Página 42 - 5.10.3. Filling the system

6.4 Gas settingsThe boiler is preset in the factory to operate on natural gasG20.6.4.1. Gas circuitWARNINGEnsure that the boiler is switched off.1. Re

Página 43 - 5.10.4. Venting the system

nSet the boiler to full load1. Continue pressing for around 3 seconds on the B key. The statussignal for the B button is orange and always flashes gre

Página 44 - 6 Commissioning

R000715-ATURN APPLIANCE OFF !Call 0844 871 1555 for advice.The appliance MUST NOT be commissioned until all problems are identified and resolved.If co

Página 45 - Commissioning the boiler

6 Commissioning ...426.1 Control panel ...

Página 46

6.4.3. Setting the air/gas ratio1. Unscrew the plug of the flue gas measurement point.2. Insert the probe for the flue gas analyser into the measureme

Página 47 - 6.4 Gas settings

2. Set the percentage CO2 for the gas type being used inside thehighest and the lowest setting limit, as determined after the fullload setting. (Front

Página 48 - Set the boiler to part load

6.6 Parameter descriptionsParameter Description Adjustment rangeFactory settingCombi System24 28 35 18 24p1Flow temperature: TSET20 to 90 °C80 80 80

Página 49

Parameter Description Adjustment rangeFactory settingCombi System24 28 35 18 24p36Shutdown input function1 = Shutdown without frost-protection2 = Shut

Página 50

7 Switching off the boiler7.1 Installation shutdownIf the central heating system is not used for a long period, werecommend switching the boiler off.4

Página 51 - Finalizing work

8 Checking and maintenance8.1 General instructionsWARNING4 Maintenance operations must be done by a qualifiedengineer.4 An annual inspection is compul

Página 52 - 6.6 Parameter descriptions

2. Remove the front panel.8.2.2. Checking the hydraulic pressureThe hydraulic pressure must reach a minimum of 0.8 bar. Ifnecessary, top up the water

Página 53

8.2.5. Checking the DHW transfer capacityIf tap capacity falls significantly (due to insufficient temperature and/or flow rate), clean the plate heat

Página 54 - 7 Switching off the boiler

8.2.9. Checking the condensate trapCAUTIONFirst remove the front housing of the boiler so that you candisconnect the condensate trap.1. Move the lever

Página 55 - 8 Checking and maintenance

8.2.10. Checking the burner and cleaning the heatexchangerCAUTIONAlways examine any seals or gaskets, replacing wherenecessary. Where a seal or gasket

Página 56

9 Troubleshooting ...639.1 Error codes ...

Página 57 - R000350-A

8.3 Specific maintenance operationsWARNINGEnsure that the boiler is switched off. Electrical isolationcan be checked at the electrical test point.CAUT

Página 58

8.3.2. Replacing the 3-way valveIf it becomes necessary to replace the 3-way valve, proceed asfollows:1. Close the main water valve.2.Drain the boiler

Página 59

If descaling of the plate exchanger is necessary, proceed as follows:1. Ensure that the boiler is switched off.2.Close the gas valve of the boiler.3.

Página 60

The expansion vessel is inside the boiler at the rear. To replace theexpansion vessel, the front section of the boiler should be removedfirst.nRemovin

Página 61

4. Carefully open the main water valve, fill the installation, vent it and,if need be, top it up with water. The hydraulic pressure must be aminimum o

Página 62

9 Troubleshooting9.1 Error codesMainEco Combi 24 - 28 - 351Domestic hot water temperature rotary knob2Heating water temperature rotary knob3Sweep key

Página 63 - Re-assembling the boiler

Status signals Description CodeShutdown code 1(1 times green signal)Temperature protection5v[1 / 5v[2 / 5v[7Shutdown code 2(2 times green signal)Shutd

Página 64

ShutdowncodeDescription Probable causes Checking / solution5v[13Communication error withthe SCU PCB4 Bad connection with BUS4 SCU PCB missing fromconn

Página 65 - 9 Troubleshooting

Status signals Description CodeError code 4(4 times red signal)Fan faulte[34Error code 5(5 times red signal)Parameter errore[00 / e[01Error code 6(6 t

Página 66

Lock out (Status signals)StatussignalsDescription Probable causes Checking / solutionError code 4(4 times redsignal)Fan fault4 External draught over t

Página 67 - 9.2.2. Lock out

02092014 - 7619497-025EC declaration of conformityThe device complies with the standard type described in the EGdeclaration of conformity. It was manu

Página 68

Lock out (Error code - e[KK)ErrorcodeDescription Probable causes Checking / solutione[10e[11Difference between theflow and returntemperatures too grea

Página 69

Lock out (Error code - e[KK)ErrorcodeDescription Probable causes Checking / solutione[35Flow and returnreversed4 Bad connection4 Sensor fault4 Sensor

Página 70

10 Spare parts10.1 GeneralWhen it is observed subsequent to inspection or maintenance workthat a component in the boiler needs to be replaced, use onl

Página 71

11 Appendix11.1 User instruction cardR000392-AGroup Signal MeaningBoiler in service(Intermittent green signal)Central heating heatHot tap waterMainten

Página 72 - 10 Spare parts

11.2 Gas boiler system commissioning checklistCONDENSING BOILERS ONLYThe condensate drain has been installed in accordance with the manufacturer’s ins

Página 73 - 11 Appendix

www.centralheating.co.ukwww.centralheating.co.uk*All installations in England and Wales must be to Local Authority Building Control (LABC) either dire

Página 74

www.centralheating.co.uk*All installations in England and Wales must beto Local Authority Building Control (LABC) either directly or through aCompeten

Página 75 - 11.3 Service record

Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24 11. Appendix02092014 - 7619497-0275

Página 76 - SERVICE 10

11. Appendix Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 247602092014 - 7619497-02

Página 77

© CopyrightAll technical and technological information contained in these technical instructions, as well as any drawings and technical descriptions s

Página 78

1.1 Building Regulations and the Benchmark Commissioning ChecklistBuilding Regulations (England & Wales) requirenotification of the installation o

Página 79 - © Copyright

Open Monday - Friday, 8am - 6pmWeekends & Bank Holidays, 8.30am - 2pmWe are closed on Christmas Day and New Year’s Day.Please note calls may be mo

Página 80 - 0844 871 1525

1.3 Installer Notification GuidelinesR000696-01Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building Control(LABC)

Comentários a estes Manuais

Sem comentários