Baxi ECOGEN 24/1.0 Manual de Serviço

Consulte online ou descarregue Manual de Serviço para Aquecedores e fervedores de água Baxi ECOGEN 24/1.0. Baxi ECOGEN 24/1.0 Technical data Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Ecogen 24/1.0

© Baxi Heating UK Ltd 2012Ecogen 24/1.0Gas Fired Wall Mounted Condensing Boilerand Power GeneratorInstallation & Servicing InstructionsThese instr

Página 2 - Natural Gas

10© Baxi Heating UK Ltd 20124.0 Technical Data4.1 Ecogen 24/1.0 and Ecogen 24/1.0 LPGFlue Terminal Diameter 100mmDimensions Projection 125mmOutercase

Página 3 - © Baxi Heating UK Ltd 2012

115.0 Dimensions and Fixings© Baxi Heating UK Ltd 2012360° Orientation Tube Ø 100mmDCBAEGFAt Least 1.5°HDimensionsA 950mmB 426mmC 450mmD 116mm Ø Min.E

Página 4 - Legislation

126.0 System Details© Baxi Heating UK Ltd 20126.1 Water Circulating Systems1. The appliance is only suitable for use on sealed systems.2. Ideally fit

Página 5 - Safe Manual Handling

136.0 System Details© Baxi Heating UK Ltd 2012BoilerFlowReturnCopper0.5mCopper1mCopper0.5mFig. 4FlowReturnPumpBoilerMagneticCleanerFig. 5Manual AirVen

Página 6 - CONTENTS

146.0 System Details© Baxi Heating UK Ltd 20126.6 Sealed Systems Details (Fig. 8)1. SAFETY VALVE - A safety valve complying with therequirements of BS

Página 7 - 1.0 Introduction

156.0 System Details© Baxi Heating UK Ltd 20126.7 Controls Component Options for Intelligent Installations1. A THINK Controller is mounted on the appl

Página 8 - 2.0 General Layout

167.0 Site Requirements© Baxi Heating UK Ltd 20127.1 Location1. Must not be located in a living space (recommendlocations, garage, utility, and outhou

Página 9 - 3.0 Appliance Operation

177.0 Site Requirement© Baxi Heating UK Ltd 20127.4 Gas Supply1. The gas installation should be in accordance with therelevant standards. In GB this i

Página 10 - Pump Head (metres)

187.0 Site Requirements© Baxi Heating UK Ltd 20127.6 Heating Plant Emissions Rate (HPER)1. To enable the house holder to claim the Feed in tariff (FIT

Página 11 - Dimensions

197.0 Site Requirements© Baxi Heating UK Ltd 2012Main ServiceFuseSuppliersBi directional Electrical BillingMeter16A Circuit Breaker(2 Pole RCD)13A BS1

Página 12 - 6.0 System Details

2© Baxi Heating UK Ltd 2012Natural GasBaxi Ecogen 24/1.0G.C.No41 075 60Building Regulations and the Benchmark CommissioningChecklistBuilding Regulatio

Página 13

207.0 Site Requirements© Baxi Heating UK Ltd 20127.8 Condensate DrainFAILURE TO INSTALL THE CONDENSATEDISCHARGE PIPEWORK CORRECTLY WILL AFFECTTHE RELI

Página 14

217.0 Site Requirements© Baxi Heating UK Ltd 20127.8 Condensate Drain (cont.)11. When discharging condensate into a soil stack or wastepipe the effect

Página 15

227.0 Site Requirement© Baxi Heating UK Ltd 20127.8 Condensate Drain (cont.)12. A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301. T

Página 16 - 7.0 Site Requirements

237.0 Site Requirements© Baxi Heating UK Ltd 20127.9 FlueNOTE: Due to the nature of the boiler a plume of watervapour will be discharged from the flue

Página 17 - 7.0 Site Requirement

248.0 Flue Options© Baxi Heating UK Ltd 2012HorizontalFluesYX8.1 Horizontal Flue Systems1. The standard flue is suitable only for horizontalterminatio

Página 18 - 5132999-02

258.0 Flue Options© Baxi Heating UK Ltd 2012VerticalFluesVerticalFlues(Twin Pipe)YxYX8.2 Twin & Vertical Flue Systems1. Maximum permissible equiva

Página 19

268.0 Flue Options© Baxi Heating UK Ltd 2012Key Accessory Size Code NoFLUE GROUP AConcentric Flue System 100mm diameterA3 Telescopic Internal Flue Kit

Página 20 - 50mm per metre of pipe run

278.0 Flue Options© Baxi Heating UK Ltd 2012For Twin Flue Systems fit the adaptors as follows:-8.4 Flue Duct Adaptor (Fig. 17)1. Engage the flue adapt

Página 21

288.0 Flue Options© Baxi Heating UK Ltd 20128.6 For Roof Terminals1. In the case of a pitched roof 25 - 50 degrees, position the leadtile to replace/f

Página 22

298.0 Flue Options© Baxi Heating UK Ltd 20128.11 Plume Displacement Kit (Fig. 21b)Kit No 5118638Content of kit1 0.9m 60/100 Concentric Flue1 1m 60 Dia

Página 23 - Property Boundary Line

3Installer Notification Guidelines© Baxi Heating UK Ltd 2012Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Página 24 - 8.0 Flue Options

308.0 Flue Options© Baxi Heating UK Ltd 2012Concentric 60/100 Flue60Ø ExhaustXYFig. 21e20123456760 Ø Exhaust (metres) XConcentric 60/100 Flue (metres)

Página 25

318.0 Flue Options© Baxi Heating UK Ltd 2012Min. 2 metresFig. 21g50mmFlue TrimPosition of ‘Jubilee’ ClipscrewFig. 21m30mm30mmFig. 21jFig. 21LFig. 21hF

Página 26

328.0 Flue Options© Baxi Heating UK Ltd 20128.13 General Fitting Notes (cont.)15. For aesthetic purposes it is permissible to route the 60Øexhaust in

Página 27

339.0 Installation© Baxi Heating UK Ltd 2010NOTE: - Installers of this appliance must have undergoneBaxi Ecogen Training and been approved to install

Página 28

349.0 Installation© Baxi Heating UK Ltd 20109.2 Fitting The Boiler1. Using a suitable lifting device, lift the appliance on its basepackaging. Offer t

Página 29

359.0 Installation© Baxi Heating UK Ltd 20129.5 Fitting The FlueHORIZONTAL TELESCOPIC FLUE1. There are two telescopic sections, the TerminalAssembly a

Página 30

369.0 Installation© Baxi Heating UK Ltd 2012 9.5 Fitting the Flue (Cont)8. Adjust the two telescopic sections to dimension ‘Y’ (Fig. 34). Ensure tha

Página 31

3710.0 Electrical© Baxi Heating UK Ltd 201210.1 Making The Electrical Connections This appliance shall be connected to a suitably protectedelectrical

Página 32 - 500mm Min

3810.0 Electrical© Baxi Heating UK Ltd 2012ENLMains230Vac 50HzIn/Out230Vac 50HzWiring Centre OutputBoiler ON InputRequirement forall installation type

Página 33 - 9.0 Installation

3910.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)C/S(Out)C/S(In)DHW(On)DHW(Off)(In)ENVal

Página 34

4Legislation© Baxi Heating UK Ltd 2012Codes of Practice - refer to the most recent versionIMPORTANT - Installation, Commissioning, Service & Repai

Página 35

4010.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)CT(In)CT(Out)DHW(On)DHW(Off)(In)ENValve

Página 36 - Dimension ‘Y’

4110.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)C/S(Out)C/S(In)DHW(On)DHW(Off)(In)ENVal

Página 37 - 10.0 Electrical

4210.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)CT(In)CT(Out)DHW(On)DHW(Off)(In)ENValve

Página 38

4310.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)C/S(Out)C/S(In)DHW(On)DHW(Off)(In)ENVal

Página 39 - Intelligent Installations

4410.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)CT(In)CT(Out)DHW(On)DHW(Off)(In)ENValve

Página 40

4510.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)C/S(Out)C/S(In)DHW(On)DHW(Off)(In)ENVal

Página 41

4610.0 Electrical© Baxi Heating UK Ltd 2012MainsSupply.PumpENLENLECH1NL(Out)(On)(Out)(Out)Boiler On (In)CH2(On)C/S(Out)C/S(In)DHW(On)DHW(Off)(Out)ENVa

Página 42

4710.0 Electrical© Baxi Heating UK Ltd 201210.12 THINK Controller, 5 LED Receiver and Wall Cradle Accessory (Figs. 42 & 43)1st GreenLED2nd GreenLE

Página 43

4810.0 Electrical© Baxi Heating UK Ltd 201210.13 To Configure the THINK Controller as a Room Sensor (cont)3. Press the menu button repeatedly until th

Página 44

4910.0 Electrical© Baxi Heating UK Ltd 2012Min. 200 mm1500 mmFig. 4510.15 Room Unit Installation Procedure 1. Room unit location: The wall cradle shou

Página 45

5Safe Manual Handling© Baxi Heating UK Ltd 2012GeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Página 46 - Retro Installations

5010.0 Electrical© Baxi Heating UK Ltd 201210.17 Wireless Installation 1. If a wireless system is being installed then communicationmust be establish

Página 47 - 5 LED Receiver

5111.0 Commissioning© Baxi Heating UK Ltd 201211.1 Preliminary Electrical Checks1. Reference should be made to BS:EN 12828, 14336 and 5449Section 5 wh

Página 48

5211.0 Commissioning© Baxi Heating UK Ltd 201211.3 Commissioning of ControlsEvery time the appliance is powered up, the controls carries out2 check

Página 49 - Min. 200 mm

5311.0 Commissioning© Baxi Heating UK Ltd 201211.3 Commissioning of Controls (cont)d) DHW set point for thermostat control. Remember: Make sure the

Página 50

5411.0 Commissioning© Baxi Heating UK Ltd 201211.3 Commissioning of Controls (cont)j) Legionella Legionella is only possible if DHW cylinder sensor

Página 51 - 11.0 Commissioning

5511.0 Commissioning© Baxi Heating UK Ltd 201211.4 Saving the sensor connections1. For intelligent installations where sensors are used, after all oft

Página 52

5611.0 Commissioning© Baxi Heating UK Ltd 2012 11.5 Starting the Appliance and Checking the Gas Rate1. The gas valve is factory set and in normal ru

Página 53

5711.0 Commissioning© Baxi Heating UK Ltd 201211.5 Starting the Appliance and Checking the Gas Rate (cont)10. Carry out the rate measurement. The burn

Página 54

5813.0 Servicing© Baxi Heating UK Ltd 201213.1 General 1. For reasons of safety and economy, it is recommended that theappliance is serviced annually.

Página 55

5913.0 Servicing© Baxi Heating UK Ltd 201213.3 Servicing - Internal IntegritySafety Note: Before removing the front cover; the correctshut down sequen

Página 56

6© Baxi Heating UK Ltd 2012CONTENTS1.0 Introduction 72.0 General Layout 83.0 Appliance Operation 94.0 Technical Data 105.0 Dimensions and Fixings 116.

Página 57 - 12.0 Completion

6013.0 Servicing© Baxi Heating UK Ltd 201213.4 Servicing – Combustion and Rate Checks 1. Perform combustion and rate checks by using the chimneysweep

Página 58 - 13.0 Servicing

71.0 Introduction© Baxi Heating UK Ltd 20121.1 Description1. The Baxi Ecogen 24/1.0 is a fully automatic gas fired wallmounted condensing heat only bo

Página 59

82.0 General Layout© Baxi Heating UK Ltd 20122.1 Layout1 Supplementary Heat Exchanger2 Burner - Supplementary 3 Ignition Electrodes4 Flame Sensing

Página 60

93.0 Appliance Operation© Baxi Heating UK Ltd 20123.1 Operating Mode (Fig. 3)1. With a demand for heating or hot water, the pumpcirculates water throu