Baxi EcoBlue Heat Manual de Início Rápido

Consulte online ou descarregue Manual de Início Rápido para Aquecedores e fervedores de água Baxi EcoBlue Heat. Baxi EcoBlue Heat Quick Start Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
Installation and Service Manual
Gas Fired Wall Mounted Powered Flue Condensing Boiler
en
United Kingdom
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
They must be read in conjunction with the Flue Installation Guide.
E
EcoBlue Heat
12 - 15 - 18 - 21 - 24
Vista de página 0
1 2 3 4 5 6 ... 63 64

Resumo do Conteúdo

Página 1 - 12 - 15 - 18 - 21 - 24

Installation and Service ManualGas Fired Wall Mounted Powered Flue Condensing BoilerenUnited KingdomThese instructions include the Benchmark Commissio

Página 2 - Model Range

10 EcoBlue Heat1 Introduction7212435 - 02 (08/14)1.5.2 Installer's ResponsibilityThe installer is responsible for the installation and in

Página 3

7212435 - 02 (08/14) EcoBlue Heat 11Introduction 11.6.3 StandardsCodes of Practice - refer to the most recent versionIn GB the following Codes

Página 4 - Contents

12 EcoBlue Heat2 Safety7212435 - 02 (08/14)2 Safety2.1 General Safety Instructions2.2 RecommendationsDANGER If you smell gas: 1. Turn off the gas s

Página 5

7212435 - 02 (08/14) EcoBlue Heat 13Safety 22.3 Specific Safety Instructions2.3.1 HandlingGeneral• The following advice should be adhered t

Página 6 - 6 EcoBlue Heat

14 EcoBlue Heat3 Technical Specification7212435 - 02 (08/14)3 Technical Specifications3.1 Technical DataNOTE: All data in this section are nominalvalu

Página 7 - 1 Introduction

7212435 - 02 (08/14) EcoBlue Heat 15Technical Specifications 33.2 Dimensions and ConnectionsIMPORTANT: The 1.5° fall provided by the elbow isto allow

Página 8 - 1.2 Additional Documentation

16 EcoBlue Heat3 Technical Specifications3.1 Technical Data (cont)7212435 - 02 (08/14)3.3 Electrical DiagramGas ValveSafetyThermostatReturnSensorFlowS

Página 9 - 1.5 Extent of Liabilities

7212435 - 02 (08/14) EcoBlue Heat 17Description of the Product 44 Description of the Product4.1 General Description1. The Baxi EcoBlue Heat Range are

Página 10 - 1.6 Homologations

18 EcoBlue Heat3 Technical Specifications7212435 - 02 (08/14)4.2 Operating Principle1. Switched Live On: When the boiler switched live turns onthe boi

Página 11 - 1.6.3 Standards

7212435 - 02 (08/14) EcoBlue Heat 19Description of the Product 44.3 Main Components1. Heat Exchanger2. Combustion Control Unit3.

Página 12 - 2 Safety

2 EcoBlue Heat 7212435 - 02 (08/14)1 IntroductionYou have just purchased one of our appliances and we thank you for the trust you have placed in our p

Página 13 - 2.3.1 Handling

20 EcoBlue Heat4 Description of the Product7212435 - 02 (08/14)4.4 Control Panel Description4.4.1 USER INTERACTION CONTROLLER (Control

Página 14 - 3 Technical Specifications

7212435 - 02 (08/14) EcoBlue Heat21Description of the Product 44.5 Standard Delivery1. The pack contains: Boiler Wall Fixing B

Página 15 - Section 5.3.6

22 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5 Before Installation5.1 Installation RegulationsInstallation must be carried out in accordanc

Página 16 - 7212435 - 02 (08/14)

7212435 - 02 (08/14) EcoBlue Heat 23Description of the Product 45.2.2 Electrical Supply1. External wiring must be correctly earthed, polarised

Página 17 - 4 Description of the Product

24 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5.2.7 System Details - GeneralWater Circulating Systems1. The appliance is suitable fo

Página 18 - 4.2 Operating Principle

7212435 - 02 (08/14) EcoBlue Heat 25Before Installation 55.2.9 Sealed Systems Details1. SAFETY VALVE - A safety valve complying with therequir

Página 19 - 4.3 Main Components

26 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5.3 Choice of the Location5.3.1 Location of the Appliance Due to the high e

Página 20 - 4.4 Control Panel Description

7212435 - 02 (08/14) EcoBlue Heat 27Before Installation 55.3.5 Condensate Drain FAILURE TO INSTALL THE CONDENSATE DIS

Página 21 - 4.6 Accessories & Options

28 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)9. If the boiler is fitted in an unheated location the entirecondensate discharge pipe should

Página 22 - 5 Before Installation

7212435 - 02 (08/14) EcoBlue Heat 29Before Installation 55.3.6 Clearances - Access in Service1. A flat vertical area is required for the insta

Página 23 - 5.2.5 System Control

7212435 - 02 (08/14) EcoBlue Heat 31Installer Notification GuidelinesChoose BuildingRegulations NotificationRouteContact your relevant LocalAuthori

Página 24 - 24 EcoBlue Heat

30 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5.3.7 Flue/Chimney Location1. The following guidelines indicate the general requiremen

Página 25

7212435 - 02 (08/14) EcoBlue Heat 31Before Installation 5 Due to the nature of the boiler a plume of water vapour will be disc

Página 26 - 5.3 Choice of the Location

32 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5.3.8 Horizontal Flue/Chimney Systems1. The standard telescopic flue is suitable only

Página 27 - 50mm per metre

7212435 - 02 (08/14) EcoBlue Heat 33Before Installation 55.3.9 Flue/Chimney Trim1. The flexible flue trims supplied can be fitted on the outer

Página 28

34 EcoBlue Heat5 Before Installation7212435 - 02 (08/14)5.4 Unpacking & Initial Preparation5.4.1 Unpacking 1. Follow the procedure on the carto

Página 29

7212435 - 02 (08/14) EcoBlue Heat 35Before Installation 55.4.4 Filling the Condensate Trap 1. The condensate trap must be filled with water befo

Página 30 - 30 EcoBlue Heat

36 EcoBlue Heat 7212435 - 02 (08/14)6 Installation6 Installation6.1 Air Supply / Flue Gas Connections6.1.1 Connecting the Top Flue HORIZONTAL TE

Página 31

7212435 - 02 (08/14) EcoBlue Heat 37Installation 610. Lift the boiler and locate the slots in the wall bracket overthe horizontal tongues on the wall

Página 32 - 315mm 500mm

38 EcoBlue Heat 7212435 - 02 (08/14)6 Installation6.2 Electrical ConnectionsY PlanDiverterValveCylinderStatRoomStatBoilerPumpTimer230V50HzL NELNCH onH

Página 33 - 5.3.10 Terminal Guard

7212435 - 02 (08/14) EcoBlue Heat 39Installation 66.3 Filling the System See Section 5.2.6. for details of treating the system,Section 5.2.7. for

Página 34 - 5.4.1 Unpacking

4 EcoBlue Heat 7212435 - 02 (08/14)ContentsContents1 Introduction1.1 General1.2 Additional Documentation1.3 Symbols Used1.4 Abbreviations1.5 Extent of

Página 35

40 EcoBlue Heat 7212435 - 02 (08/14)7 Commissioning7 Commissioning7.1 General1. Reference should be made to BS:EN 12828 & 14336 whencommissioning

Página 36

7212435 - 02 (08/14) EcoBlue Heat 41Commissioning 77.4 Gas Settings7.4.1 ‘Chimney Sweep’ Mode (CSM)1. The current operating condition of the boi

Página 37

42 EcoBlue Heat 7212435 - 02 (08/14)7 CommissioningSet Boiler to Maximum RateAllow the combustion to stabilise. Do not insert probeto avoid ‘flooding’

Página 38 - 6.2 Electrical Connections

7212435 - 02 (08/14) EcoBlue Heat 43Commissioning 77.5.1 Check the Operational (Working) Gas Inlet Pressure 1. Ensure that al

Página 39 - 6.3 Filling the System

44 EcoBlue Heat 7212435 - 02 (08/14)7 Commissioning7.6 Final Instructions1. Carefully read and complete all sections of the BenchmarkCommissioning Che

Página 40 - 7 Commissioning

7212435 - 02 (08/14) EcoBlue Heat 45Operation 88 Operation8.1 General1. It is the responsibility of the installer to instruct the user in theday to da

Página 41 - 7.4 Gas Settings

46 EcoBlue Heat 7212435 - 02 (08/14)8 Operation8.4 Use of the Control Panel8.5 Frost Protection1. To prevent radiators and pipework from freezing in a

Página 42

7212435 - 02 (08/14) EcoBlue Heat 47Settings 99 Settings9.1 Parameters The operating parameters for this boiler are factory set.

Página 43 - 7.5 Configuring the System

48 EcoBlue Heat 7212435 - 02 (08/14)10 Maintenance10 Maintenance10.1 GeneralWARNINGWhen changing components ensure that both thegas and electrical sup

Página 44 - 7.6 Final Instructions

7212435 - 02 (08/14) EcoBlue Heat 49Maintenance 1010.2 Standard Inspection and Maintenance Operation When performing any inspection or mai

Página 45 - 8 Operation

7212435 - 02 (08/14) EcoBlue Heat 5Contents5.3.9 Flue/Chimney Trim5.3.10 Terminal Guard5.3.11 Flue/Chimney Deflector5.3.12 Flue/Chimney Accessories5.4

Página 46 - 8.5 Frost Protection

50 EcoBlue Heat 7212435 - 02 (08/14)10 Maintenance10.3 Specific Maintenance OperationWARNINGWhen changing components ensure that both thegas and elect

Página 47 - 9 Settings

7212435 - 02 (08/14) EcoBlue Heat 51Maintenance 10 Removal of the fan air duct and flue outlet duct is necessary to enable th

Página 48 - 10 Maintenance

52 EcoBlue Heat 7212435 - 02 (08/14)10 Maintenance10.3.6 Flow Temperature Sensor (Fig. 44) The sensor is fitted in a ‘dry’ pocket.1. D

Página 49

7212435 - 02 (08/14) EcoBlue Heat 53Maintenance 1010.3.10 Gas Valve (Figs. 47, 48 & 49) After replacing the valve the CO2must be che

Página 50

54 EcoBlue Heat 7212435 - 02 (08/14)10 Maintenance10.3.11 Control & Fan Assembly (Figs. 50, 51 & 52)1. Ensure that the gas supply to the bo

Página 51

7212435 - 02 (08/14) EcoBlue Heat 55Maintenance 1010.3.13 Setting the Gas Valve (CO2Check) The CO2must be only be checked and adjusted

Página 52

56 EcoBlue Heat 7212435 - 02 (08/14)11 Troubleshooting11 Troubleshooting11.1 Error CodesStatus signalDescription Remedial actions by serviceengineer

Página 53

7212435 - 02 (08/14) EcoBlue Heat 57Troubleshooting 11Remedial actions by serviceengineer Status signalDescription Possible cause s1 flashredSensor e

Página 54

58 EcoBlue Heat 7212435 - 02 (08/14)12 Decommissioning12 Decommissioning12.1 Decommissioning Procedure1. Disconnect the gas & electric supplies an

Página 55 - Analyser Probe

7212435 - 02 (08/14) EcoBlue Heat 59Spare Parts 1313 Spare Parts13.1 General1. If, following the annual inspection or maintenance any part ofthe boile

Página 56 - 11 Troubleshooting

6 EcoBlue HeatContents10 Maintenance10.1 General10.2 Standard Inspection & Maintenance Operation10.3 Specific Maintenance Operation10.3.1 Spark Ig

Página 57 - Troubleshooting 11

60 EcoBlue Heat 7212435 - 02 (08/14)Notes 14

Página 58 - 12 Decommissioning

7212435 - 02 (08/14) EcoBlue Heat 61Notes 14

Página 59 - 13 Spare Parts

62*All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through aCompetent Persons Scheme. A B

Página 60 - Notes 14

63www.centralheating.co.ukIt is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is complet

Página 61

BAXI A Trading Division of Baxi Heating UK Ltd (3879156)Brooks House, Coventry Road, Warwick. CV34 4LLAfter Sales Service 0844 871 1525 Technical Enqu

Página 62

7212435 - 02 (08/14) EcoBlue Heat 7Introduction 1 1 Introduction1.1 General WARNING Installation, repair and mainten

Página 63 - SERVICE RECORD

8 EcoBlue Heat1 Introduction7212435 - 02 (08/14)1.3 Symbols Used DHW: Domestic hot water CH: Central heating GB: Great Britain IE: Ir

Página 64 - Website www.baxi.co.uk

7212435 - 02 (08/14) EcoBlue Heat 9Introduction 11.5 Extent of Liabilities1.5.1 Manufacturer's Liability Our products are manufactured in c

Comentários a estes Manuais

Sem comentários