© Baxi Heating UK Ltd 2012
Duo-tec 2 Combi GA Range
Gas Fired Wall Mounted Condensing
Combination Boiler
Installation & Servicing Instructions
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
They must be read in conjunction with the Flue Installation Guide.
Vista de página 0
1 2 3 4 5 6 ... 27 28

Resumo do Conteúdo

Página 1 - Duo-tec 2 Combi GA Range

© Baxi Heating UK Ltd 2012Duo-tec 2 Combi GA RangeGas Fired Wall Mounted CondensingCombination BoilerInstallation & Servicing InstructionsThese in

Página 2 - Model Range

104.0 Technical Data© Baxi Heating UK Ltd 20120200 400 600 800 1000 12000.511.522.533.54Metre (wg)Flow Rate (l/h)Pump - Available Head055.564.54.1Fl

Página 3 - © Baxi Heating UK Ltd 2012

115.0 Dimensions and Fixings© Baxi Heating UK Ltd 2012DimensionsA 763mmB 355mm**This can be reduced to 345mm byremoving the boiler control access flap

Página 4 - Legislation

126.0 System Details© Baxi Heating UK Ltd 20126.1 Information1. The Baxi Duo-tec Combi HE GA Condensing CombinationBoiler is a ‘Water Byelaws Scheme

Página 5 - Safe Manual Handling

136.0 System Details© Baxi Heating UK Ltd 2012Fig. 4Fig. 6Pressure Relief ValveDischarge PipeFig. 56.5 System Filling and Pressurising1. A filling poi

Página 6 - CONTENTS

146.0 System Details© Baxi Heating UK Ltd 20126.8 Domestic Hot Water Circuit (Fig. 7)1. All DHW circuits, connections, fittings, etc. should be fullyi

Página 7 - 1.0 Introduction

157.0 Site Requirements© Baxi Heating UK Ltd 20127.1 Location1. The boiler may be fitted to any suitable wall with the fluepassing through an outside

Página 8 - 2.0 General Layout

167.0 Site Requirement© Baxi Heating UK Ltd 20127.4 Gas Supply1. The gas installation should be in accordance with therelevant standards. In GB this i

Página 9 - 3.0 Appliance Operation

177.0 Site Requirements© Baxi Heating UK Ltd 20127.7 Condensate DrainFAILURE TO INSTALL THE CONDENSATEDISCHARGE PIPEWORK CORRECTLY WILL AFFECTTHE RELI

Página 10 - PROPANE ONLY !

187.0 Site Requirements© Baxi Heating UK Ltd 20127.7 Condensate Drain (cont.)11. When discharging condensate into a soil stack or wastepipe the effect

Página 11 - Dimensions

197.0 Site Requirements© Baxi Heating UK Ltd 20127.7 Condensate Drain (cont.)12. A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301.

Página 12 - 6.0 System Details

2© Baxi Heating UK Ltd 2012© Baxi Heating UK Ltd 2012 All rights reserved. No part of this publication maybe reproduced or transmitted in any form or

Página 13

207.0 Site Requirements© Baxi Heating UK Ltd 20127.8 FlueNOTE: Due to the nature of the boiler a plume of watervapour will be discharged from the flue

Página 14

218.0 Flue Options© Baxi Heating UK Ltd 20128.1 Horizontal Flue Systems1. The standard flue is suitable only for horizontaltermination applications.2.

Página 15 - 7.0 Site Requirements

228.0 Flue Options© Baxi Heating UK Ltd 20128.2 Flue LengthsThe standard horizontal telescopic flue kit allows for lengthsbetween 315mm and 500mm from

Página 16 - 7.0 Site Requirement

239.0 Installation© Baxi Heating UK Ltd 20079.1 Unpacking & Initial PreparationIMPORTANT RISK ASSESSMENT - Before commencing the installationit is

Página 17 - 50mm per metre of pipe run

249.0 Installation© Baxi Heating UK Ltd 20129.3 Fitting The Boiler1. Remove the sealing caps from the boiler connections.NOTE: A small amount of water

Página 18

259.0 Installation© Baxi Heating UK Ltd 20129.6 Fitting The FlueHORIZONTAL TELESCOPIC FLUE1. There are two telescopic sections, the TerminalAssembly a

Página 19

269.0 Installation© Baxi Heating UK Ltd 2012Fig. 30Flue ElbowBoilerAdaptorFig. 29Apply the lubricantsupplied for ease ofassembly (do not useany other

Página 20 - Property Boundary Line

279.0 Installation© Baxi Heating UK Ltd 2012bbrbbkg/y1NL 2NNLRoom ‘StatFused Spur230VFig. 36Fig. 34Control Boxbbrbbkg/y1NL Frost ThermostatExternal Cl

Página 21 - 8.0 Flue Options

10.1 Commissioning the Boiler1. Reference should be made to BS:EN 12828, 12831 & 14336when commissioning the boiler. Ensure that the trap has been

Página 22

3Installer Notification Guidelines© Baxi Heating UK Ltd 2012Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Página 23 - 9.0 Installation

4Legislation© Baxi Heating UK Ltd 2012Codes of Practice - refer to the most recent versionIMPORTANT - Installation, Commissioning, Service & Repai

Página 24

5Safe Manual Handling© Baxi Heating UK Ltd 2012GeneralThe following advice should be adhered to, from when first handling the boiler to the final stag

Página 25 - Dimension ‘Y’

6© Baxi Heating UK Ltd 2012CONTENTS1.0 Introduction 72.0 General Layout 83.0 Appliance Operation 94.0 Technical Data 105.0 Dimensions and Fixings 116.

Página 26

71.0 Introduction© Baxi Heating UK Ltd 2012Fig. 11.1 Description1. The Baxi Duo-tec 2 Combi GA Range are fully automaticgas fired wall mounted condens

Página 27

82.0 General Layout© Baxi Heating UK Ltd 20122.1 Layout1. Expansion Vessel2. Expansion Vessel Valve3. Primary Heat Exchanger4. DHW Plate Heat Exchange

Página 28 - 10.0 Commissioning

93.0 Appliance Operation© Baxi Heating UK Ltd 20123.1 Central Heating Mode1. With a demand for heating, the pump circulates waterthrough the primary c