
Please keep these instructions in a safe place.If you move house, please hand them over to the next occupier.© Baxi Heating UK Ltd 2010BiofloPellet Ce
10For the InstallerFront viewSide viewAll dimensions in mm:2.3 Dimensional sketches2.3.1 BAXI Bioflo flue gas and air supply connectionFig. 5 BAXI Bio
11For the InstallerAll dimensions in mm:Front view Side viewFig. 8 BAXI Bioflo with hydraulic fittings fittingsHV...Heating feed (3/4” pipe)HR...
2.4 Minimum service clearances for fire protection, cleaning and maintenanceThe following minimum service clearances from flammable materials and for
For the Installer1)Dimension Clearance Descriptiona 800 mm Minimum clearance in radiation area (front window) from flammable materialsb 500 mm Minimum
For the Installer2.4.3 Minimum service clearances with flue gas tube connection to the left or right sideDimension Clearance Descriptiona 800 mm Minim
15For the Installer2.5.1 Heating fittingsSafety valve 2.5 bar (in BAXI Bioflo under the front cover as standard): The safety valve is type-tested (cod
For the Installer2.5.3 Domestic water (hot water tank)If BAXI Bioflo is used for loading a hot water tank, a gravity brake must be installed in the he
Diagram 2 water-side resistance - BAXI Bioflo2.5.7 Water-side resistance (pressure loss) Pressure loss (mbar)Flow rate (m3/h)BAXI Bioflo2.5.6 Heating
For the Installer2.6 Installing the claddingThe cladding comprises the following parts:41 Rear left side panel2 Left side panel3 Front cover plate4 Fr
Fig. 15 Screwing on gas springsBAXI Bioflo with manual filling– Screw on the gas springs for BAXI Bioflo with manual filling (Fig. 15) – Take pressure
© Baxi Heating UK Ltd 2010 All rights reserved. No part of this publication maybe reproduced or transmitted in any form or by any means, or stored in
20For the InstallerFig. 23 Inserting the hinges in the side panel Fig. 24 Checking the setting of the door safety switchFig. 25 Putting on the front c
21For the Electrician3.1 Electrical connectionsThe pellet flue-connected boiler and related accessories are designed to be installed only in dry areas
Fig. 29 Cable feed-throughs – rear viewElectrical power supply 230 VAC (mains plug) and electrical connections:Electrical power supply 230 VAC (mains
234.2 Service and repair workService and repair may be performed only by appropriately qualified technicians.Always disconnect the mains power plug fo
4.3 Technical data for calculating the fluegas system acc. to EN 13384-14.4 Technical data – GeneralFor the Service TechnicianBAXI Bioflo pellet flue-
For the Service Technician4.5 Service levelSystem parameters, start-up or actuator test can be displayed, modified and/or performed on the service lev
5sRESET5sRESET5sRESET5sRESET5sRESETFor the Service TechnicianFig. 32Fig. 33Service levelPressing the Menubutton changes the display to the “Operatorle
Hysteresis Burner ONSwitching hysteresis for burner control – Fig. 40Factory setting: 5 KSetting range: 0 – 20 KFig. 40HysteresisBurner ONSave– Yes No
Maximum value of set temperatureThis is the maximum setpoint achievable in normal heating operation – Fig. 41.Factory setting: 75 °CSetting range: 60
For the Service Technicianminimum maximumFactory setting: rpm 1250 2050Setting range: rpm 1150–1450 1950–2250Step width: rpm 50Limits for blower speed
Important initial information for the Technician . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41.1 Safety . . . . . . . . . . . . . . .
For the Service Technician4.5.2 Start-upThe auger conveyor and the feed can be selected on the Start-up level with the arrow buttons and the selec-tio
4.6 BAXI Bioflo basic circuitryFor the Service Technician092464/0131
4.7 BAXI Bioflo connecting diagram For the Service Technician32
334.8 Connecting diagram for air intake/exhaust flapAir intake/exhaust flap with limit switchAir intake/exhaust flap without limit switchLimit switch
Notes
Guarantee & Warranty LimitationsThe guarantee and warranty limitations require that the boilerand related accessories be properly installed, commi
© Baxi Heating UK Ltd 2010Issue 720574501 (9/10)All descriptions and illustrations provided in this leaflet have been carefullyprepared but we reserve
Important initial information for the Technician1.1 SafetyThe boiler and related accessories reflect the state of the art and meet all applicable safe
Important initial information for the Technician1.6 FlueA properly dimensioned flue is required for optimal functioning of the combustion system. Meas
6For the Installer2.1 Delivery, packagingHydraulic equipment type/order no.with circulation pump, expansion tank 12 l, safety valve and pressuregaugeB
72.2.2 Heat radiationThe viewing panel of the BAXI Bioflo means it is inevitable that heat will be radiated into the installation room. The distributi
For the InstallerFig. 2 BAXI Bioflo in an installation room (more than approx. 15 % of the entire area to be heated)2.2.3 Installation siting– The min
For the InstallerMalfunctions or complaints occasioned by inadequate combustion air will not be covered by theguarantee!a) Operating with room air:(Co
Comentários a estes Manuais