Baxi Bermuda BBU 15 HE
Condensing Back Boiler Unit
These Instructions must be read in conjunction with those for
the separate Valor Dimension electric firefront.
They include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
Installation & Servicing Instructions
Vista de página 0
1 2 3 4 5 6 ... 43 44

Resumo do Conteúdo

Página 1 - Baxi Bermuda BBU 15 HE

© Baxi Heating UK Ltd 2014Baxi Bermuda BBU 15 HECondensing Back Boiler UnitThese Instructions must be read in conjunction with those for the separate

Página 2 - Natural Gas

10© Baxi Heating UK Ltd 2014Sedbuk Declaration For Bermuda BBU 15 HEThe seasonal efficiency SEDBUK 2005is 90.1%This value is used in the UK Government

Página 3

4.0 System Details11© Baxi Heating UK Ltd 20144.1 Water Circulating Systems1. The appliance is suitable for use on fully pumpedsystems ONLY w

Página 4 - Legislation

4.3 Pipework1. The sizes of the flow and return pipes from theboiler should be determined by normal methodsaccording to the requirements of the

Página 5 - Safe Manual Handling

4.0 System Details13© Baxi Heating UK Ltd 20144.7 Sealed Systems (Figs. 6, 7 & 8)1. SAFETY VALVE - A safety valve complying with therequi

Página 6 - Contents

14© Baxi Heating UK Ltd 20145.0 Site Requirements595mm (Regalia firefront ONLY -575mm )SURROUND OR FINISHEDWALL FACESolid, non combustiblehearth to

Página 7 - 1.0 Introduction

5.0 Site Requirements16© Baxi Heating UK Ltd 20145.5 Flue1. The following guidelines indicate the generalrequirements for installation of flu

Página 8 - 2.0 General Layout

5.0 Site Requirements16© Baxi Heating UK Ltd 20145.6 Ventilation1. No ventilation is required for the boiler in the room ofinstallation.5.7

Página 9

5.0 Site Requirements17© Baxi Heating UK Ltd 20145.9 Condensate Drain - General1. Ensure the discharge of condensate complies with any nation

Página 10 - 3.0 Technical Data

18© Baxi Heating UK Ltd 20145.0 Site Requirements5.11 Condensate Disposal - Pipe Runs1. 3.5 metres of flexible 10mm condensate dischargepipe an

Página 11 - 4.0 System Details

19© Baxi Heating UK Ltd 20145.0 Site Requirements5.11 Condensate Disposal Pipe Runs (cont.)7. When A to B at max. (2.5m) B to C can be up to 8m

Página 12

2© Baxi Heating UK Ltd 2014Natural GasBaxi Bermuda BBU 15 HEG.C.No. 44 075 09For use with the following electric firefronts:Valor Dimension Classica B

Página 13

20© Baxi Heating UK Ltd 20145.0 Site Requirements5.11 Condensate Disposal Pipe Runs (cont.)Underfloor Runs10. On installations where the discha

Página 14 - 5.0 Site Requirements

21© Baxi Heating UK Ltd 20145.0 Site Requirements5.11 Condensate Disposal Pipe Runs (cont.)14. Ensure that the condensate can discharge freely

Página 15

22© Baxi Heating UK Ltd 2014Fig. 22Fig. 23Fig. 24Fig. 256.0 InstallationINSTALLATION SEQUENCEThere are 4 main elements to the installation of theBax

Página 16

6.0 Installation23© Baxi Heating UK Ltd 20146.2 Flue System (cont.)8. It is recommended that the Pull Cone Flue Adaptor(part no. 720111801) i

Página 17

6.0 Installation24© Baxi Heating UK Ltd 20146.2 Flue System (cont.)16. Pass the air duct collar and air cowl over the 60mmflue duct (Fig. 34)

Página 18

6.0 Installation25© Baxi Heating UK Ltd 20146.3 Siting the BoilerIMPORTANT: This product should be lifted and handledby two people. Stooping

Página 19 - © Baxi Heating UK Ltd 2014

26© Baxi Heating UK Ltd 20147.0 Completion & Commissioning 7.1 Completion1. Seal off any secondary openings within the buildersopening af

Página 20 - 10mm pipe

27© Baxi Heating UK Ltd 20147.0 Completion & Commissioning7.2 Commissioning the Boiler (cont.)Checked:That the boiler has been installed

Página 21

7.0 Completion & CommissioningSet Boiler to Maximum Rate(see 7.2.14)Allow the combustion to stabilise. Do not insert probe toavoid ‘flooding’ th

Página 22 - 6.0 Installation

29© Baxi Heating UK Ltd 20148.0 Annual ServicingOff PositionFig. 49On PositionFig. 508.1 Annual Servicing1. For reasons of safety and economy

Página 23

Installer Notification Guidelines3© Baxi Heating UK Ltd 2014Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building

Página 24

30© Baxi Heating UK Ltd 20148.0 Annual Servicing8.2 Annual Servicing - Inspection1. Ensure that the boiler is cool.2. Ensure that the gas sup

Página 25

31© Baxi Heating UK Ltd 20149.0 Changing Components9.1 Changing ComponentsTo change any components on the back boiler it isnecessary to remov

Página 26 - 7.1 Completion

32© Baxi Heating UK Ltd 20149.5 Fan (Fig. 56)1. Disconnect the two plugs from the fan motor andremove the sensing pipe from between the gas val

Página 27 - Fig. 47a

33© Baxi Heating UK Ltd 20149.0 Changing Components9.8 Gas Valve (Fig. 58)IMPORTANT:After replacing the valve the CO2must bechecked and adjus

Página 28

34© Baxi Heating UK Ltd 20149.9 PCB (Fig. 61)1. Pull off the two control knobs and disengage the securingtabs of the cover. Undo the screws sec

Página 29 - 8.0 Annual Servicing

35© Baxi Heating UK Ltd 201410.0 Setting the Gas Valve10.1 Setting the Gas Valve (CO2check)IMPORTANT:The CO2must be only be checked andadjusted t

Página 30

36© Baxi Heating UK Ltd 201411.0 Fault FindingNOTE: When instructed tooperate the reset button, press andhold for 5 seconds to reset theboiler.11.1

Página 31 - 9.0 Changing Components

11.0 Fault Finding37© Baxi Heating UK Ltd 2014Refer to Section 13.0 “Boiler Internal Wiring” for position of terminals and componentsCentral Heating -

Página 32

11.0 Fault Finding38© Baxi Heating UK Ltd 2014Fault Finding Solutions SectionsIs there 230V at:Check all system wiring and pumpMain terminals L and N

Página 33

11.0 Fault Finding39© Baxi Heating UK Ltd 2014Check and correct if necessary1. The mechanical set of the gas valve(CO2 values - see instruction)2. Fl

Página 34

Legislation4© Baxi Heating UK Ltd 2014Codes of Practice, most recent version should be usedIn GB the following Codes of Practice apply:Standard

Página 35 - 10.0 Setting the Gas Valve

40© Baxi Heating UK Ltd 201412.0 Short Parts ListShort Parts ListKey Description ManufacturersNo. Part No.A Burner Assy 7201257

Página 36 - 11.0 Fault Finding

41© Baxi Heating UK Ltd 201413.0 Boiler Internal Wiring13.1 Boiler Internal Illustrated Wiring Diagram- brown- black- blue- white- yellowbrbkbwy-

Página 37

*All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through aCompetent Persons Scheme. A Bui

Página 38

www.centralheating.co.ukIt is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed

Página 39

© Baxi Heating UK Ltd 2014Comp No7101615 - 04 (2/14 )9.0 Warranty & ServiceSerial NumberDate of InstallationInstaller Details (name, address

Página 40 - 12.0 Short Parts List

Safe Manual Handling5© Baxi Heating UK Ltd 2014 GeneralThe following advice should be adhered to, from when first handling the boiler to the final

Página 41 - 13.0 Boiler Internal Wiring

6© Baxi Heating UK Ltd 2014Contents1.0 Introduction 72.0 General Layout

Página 42

© Baxi Heating UK Ltd 2014Fig. 17Fig. 21.0 Introduction1.1 Description1. The Baxi Bermuda BBU 15 HE is a central heatingboiler designed for i

Página 43 - SERVICE RECORD

2.0 General Layout8© Baxi Heating UK Ltd 20142.1 Layout (Fig. 3)1. Automatic Air Vent2. Flue Connection3. Sp

Página 44 - 9.0 Warranty & Service

9© Baxi Heating UK Ltd 20142.0 General Layout2.2 Flue Kit (10m & 12.5m) (Fig. 3a)1. Terminal Cap2. Flue Duct Adapto