© Baxi Heating UK Ltd 2010Installation & Service InstructionsOnly a flue approved for the Suprima HE can be used.These instructions include the Be
© Baxi Heating UK Ltd 2010103.6 Condensate DisposalThis boiler incorporates a 75 mm trap.Ensure the disposal of condensate complies withany national o
© Baxi Heating UK Ltd 2010113.7 Air SupplyThe room in which the boiler is installed does not requirea purpose provided air vent.3.7.1 Ventilated Cupbo
© Baxi Heating UK Ltd 201012IMPORTANT:• Only ONE 25mm clearance is allowed per installation.• Under car ports we recommend the use of the plume displa
© Baxi Heating UK Ltd 2010133.8.2 Horizontal Flue Systems1. The standard flue is suitable only for horizontalapplications.2. Maximum permissible equiv
© Baxi Heating UK Ltd 201014VerticalFlues(Twin Pipe)YXVerticalFluesYXThe total equivalent length for thisexample is = 5.5 metres.1m extension135°bend
© Baxi Heating UK Ltd 201015Key Accessory Size Baxi CodeNoFLUE GROUP AConcentric Flue System 100mm diameterA3 Telescopic Internal Flue Kit 315-500mm 5
© Baxi Heating UK Ltd 201016For Twin Flue Systems fit the adaptors as follows:-3.8.5 Vertical Flue Duct Adaptor (Fig. 11)1. Remove the flue elbow from
© Baxi Heating UK Ltd 201017Fig. 13Fig. 14100mm685mmPush FitAdaptorAir DuctFlue DuctCut the sameamount offthe Air Duct& Flue DuctApprox1425mm3.8.7
© Baxi Heating UK Ltd 2010183.9 Plume Displacement Kit (Fig. 14b)Kit No 5118638Content of kit1 0.9m 60/100 Concentric Flue1 1m 60 Dia Exhaust Flue Pip
© Baxi Heating UK Ltd 201019Concentric 60/100 Flue60Ø ExhaustXYFig. 1720246810121460 Ø Exhaust (metres)Concentric 60/100 Flue (metres)016181320FGFig.
© Baxi Heating UK Ltd 20102Contents1. Introduction...42. Technical Data...
© Baxi Heating UK Ltd 201020Min. 2 metresFig. 1950mmFlue TrimPosition of ‘Jubilee’Clip screwFig. 2430mm30mmFig. 21Fig. 23Fig. 20Fig. 22AdaptorSpigot3.
© Baxi Heating UK Ltd 2010213.9.2 General Fitting Notes (cont.)15. For aesthetic purposes it is permissible to route the60Ø exhaust in an enclosed box
© Baxi Heating UK Ltd 2010223.10 Water Circulating SystemsThe boiler is suitable for use with fully pumped openvented and sealed systems with an indir
© Baxi Heating UK Ltd 201023Min. 11°C Max. 20°Cl/min11.515.219.222.926.730.5mbar21.234.153.073.597.5124.6m0.220.350.540.750.991.2730 HE40 HE50 HE60 HE
© Baxi Heating UK Ltd 2010243.10.6 Sealed SystemsSystem ComponentsAll components used in the sealed system must besuitable for operation at 110°C and
© Baxi Heating UK Ltd 20102522mmFlowReturnBoilerOptional2 portvalvesIndirect HECylinderAuto air ventTypical Fully Pumped Sealed System** If plastic pi
© Baxi Heating UK Ltd 201026MINIMUM CLEARANCEMINIMUM CLEARANCEMINIMUM CLEARANCEMINIMUM CLEARANCEBOILER OUTLINECore DrillFlue Hole105mm (4")minimu
© Baxi Heating UK Ltd 201027Rear flueSide fluewasteDimensionXDimensionXTerminal guardif requiredWall sealDimension X + 50 mmVisual check holeInner flu
© Baxi Heating UK Ltd 2010284.3 Electrical ConnectionsFor the boiler to operate correctly itrequires a four wire connection. Theremust be mains Perman
© Baxi Heating UK Ltd 201029Flow 22 mmReturn 22 mmCaseSeals30355855Front ViewMountingBracketWallSideView304.4 Connect the Gas Supply1. Ensure that the
© Baxi Heating UK Ltd 20103Choose BuildingRegulations NotificationRouteContact your relevant LocalAuthority Building Control(LABC) who will arrangean
© Baxi Heating UK Ltd 2010305. Wiring Diagrams OverheatStatSparkGeneratorSparkElectrodeFlameDetectionElectrodeFanGasValveFlowThermistorCastingThermist
© Baxi Heating UK Ltd 201031Fig. 40Typical System WiringNCCRoomstatCylstatNOCNNCNHW onEHW offLCH onPumpMainsThis Appliance must be EarthedNNLEESwLLOpt
© Baxi Heating UK Ltd 2010326.1 Commission the Water, Electrical and GasSystemsWaterThe system should be cold flushed. After re-filling, all air must
© Baxi Heating UK Ltd 2010336.4 Final AdjustmentsTemperature ControlTurn the temperature control knob to adjust the radiatorsurface temperature and ho
© Baxi Heating UK Ltd 2010347. Control SequenceCheckthermistorsgive validreadingsIndicate thermistor faultStandbySwitched live - ONOn/Off switch - ONP
© Baxi Heating UK Ltd 2010358. Fault Finding GuideFig. 43FAULT CONTROL DISPLAY RESETLockout Burner Mains Electrical Su
© Baxi Heating UK Ltd 201036Lockout Burner Mains Electrical Supply FaultRefer to the boiler wiring diagramYesIs there 2
© Baxi Heating UK Ltd 201037Lockout Burner Mains Ignition LockoutRefer to the boiler wiring diagram ononoffYesIs more t
© Baxi Heating UK Ltd 201038Overheat LockoutRefer to the boiler wiring diagram Lockout Burner Mains No YesNo YesFalse F
© Baxi Heating UK Ltd 201039Air Proving Lockout Lockout Burner Mains Check for blockages in the condensatesystem, the f
© Baxi Heating UK Ltd 201041. IntroductionPotterton Suprima HESuprima 30 HE G.C. No. 41 075 35 Suprima 40 HE G.C. No. 41 075 36Suprima 50 HE G.C. No.
© Baxi Heating UK Ltd 201040Fig. 48Air Pressure Switch Stuck FaultRefer to the boiler wiring diagramLockout Burner Main
© Baxi Heating UK Ltd 201041Thermistor Fault - Flow and Casting Refer to the boiler wiring diagramCasting thermistor faultLockout Burne
© Baxi Heating UK Ltd 2010429. Servicing• For reasons of safety and economy the boiler shouldbe serviced annually by a competent person.• Any 'O&
© Baxi Heating UK Ltd 201043Fan and Flue HoodAir Pressure SwitchSecondaryHeat ExchangerCondensate TrapGas ValvePrimaryHeat ExchangerPCB EnclosureBurne
© Baxi Heating UK Ltd 2010449.2 General Access1. Isolate the supplies as detailed in 9.1.2.2. Pull the door panel down and remove the twoscrews. Caref
© Baxi Heating UK Ltd 2010459.5 Air Pressure Switch1. Perform General Access - See 9.2.2. Disconnect the wires at the switch.3. Note how they are fitt
© Baxi Heating UK Ltd 2010469.9 Fan and Flue Hooda.c fan - 30 to 60 modelsd.c. fan - 70 and 80 models1. Perform General Access - See 9.2.2. Remove the
© Baxi Heating UK Ltd 2010479.10 Electrodes/Burner1. Perform General Access - See 9.2.2. Remove the combustion chamber cover - See 9.9.3. Disconnect t
© Baxi Heating UK Ltd 2010489.12 Combustion ChamberInsulationImportant: See Section 3.1, Health and Safety information before handling insulation.1. P
© Baxi Heating UK Ltd 2010499.13 Condensate Trap1. Perform General Access - See 9.2.Place a vessel underneath to catch the condensate then remove the
© Baxi Heating UK Ltd 20105Health and Safety Information for the Installer andService EngineerUnder the Consumer Protection Act 1987 and Section6 of t
© Baxi Heating UK Ltd 2010509.14 Primary Heat Exchanger1. Perform General Access - See 9.2.2. Drain the system as necessary.3. Remove the combustion c
© Baxi Heating UK Ltd 2010519.15 Secondary Heat Exchanger1. Perform General Access - See 9.2.2. Drain the system as necessary.3. Drain the Heat Exchan
© Baxi Heating UK Ltd 20105210. Short SparesFig. 64308322305313207331200[30 to 60HE]206[60 to 80HE]206[30 to 50HE]216[30 to 50HE]216[60 to 80HE]200[70
© Baxi Heating UK Ltd 201053Drg. Ref. G.C. No. Description Qty Part No.120 114-852 Sight glass mica 1 238162121 114-872 Mica retainer outer 1 23810620
GAS BOILER SYSTEM COMMISSIONING CHECKLISTCONTROLS Tick the appropriate boxesTime and Temperature Control to Heating Room Thermostat and Programma
SERVICE RECORDIt is recommended that your heating system is serviced regularly and that the appropriate Service Record is completed.Service ProviderBe
Comp No. 5111596 - Iss 7 - 12/09© Baxi Heating UK Ltd 2008POTTERTONA Trading Division of Baxi Heating UK Ltd (3879156)A Division of Baxi GroupBrooks H
© Baxi Heating UK Ltd 20106Model Seasonal Efficiency(SEDBUK) (%)30 86.140 86.450 86.260 86.270 86.280 86.2Models 30 HE 40 HE 50 HE 60 HE 70 HE 80 HEHe
© Baxi Heating UK Ltd 20107595 mm400 mm5 mmclearance125 mmclearance130 mm servicing clearance50 mm installation clearance*5 mmclearance410 mm overallc
© Baxi Heating UK Ltd 201083.3 Gas SupplyThe meter and supply pipes must be capable of deliveringthe required quantity of gas in addition to the deman
© Baxi Heating UK Ltd 201093.4 Electricity Supply230V ~ 50Hz via a fused double pole switch witha contact separation of at least 3 mm in bothpoles.The